Energy-saving and high-efficiency pulverizer

The Coal Preparation Process 1.The raw coal magnetically separated after coarse crushing;2.Coal going to coal supply machine from hopper;3.Coal going to grinding chamber with hot dry air;4.Broken coal going to a swirl wind separator through the primary wind generated by mill itself.5.

Featured Products

The Coal Preparation Process 
1.The raw coal magnetically separated after coarse crushing;
2.Coal going to coal supply machine from hopper;
3.Coal going to grinding chamber with hot dry air;
4.Broken coal going to a swirl wind separator through the primary wind generated by mill itself.
5.Fine coal combusting in burner after transmitted through a pipeline. 
6.Due to the larger inertia, coarse coal cannot be taken away by primary wind after a whirlwind separator, going back into the hopper and being regrinded through feeding entrance.
 
NOTES:
The primary wind temperature had better reach 250 ~ 300 °C when going to the mill. Coal should be magnetic separated before going into the mill to remove metal, wood and other objects from coal. The coal particle size and surface water shall meet the following requirements before grinding
 

Products range:


  Type

 

WHAJ-S-5000

WHAJ-S-3500

WHAJ-S-2500

WHAJ-S-2000

 

      Capacity(kg/h)

5000

3500

2500

2000

The Coal FinesR% Residues

0~20%

0~20%

0~20%

0~20%

Pressure

kpa

3.70

3.43

3.3

3.13

Impeller speed

(r.p.m)

1480

1480

1480

1470

Main motor

Y315M2-4  -132KW

Y315M-4

-90KW

Y280M-4

-75KW

Y280M-4

-55KW


Packaging & Shipping
We have developed long and good relationship with many shipping agents. 
Ocean freight partners are: APL, COSCO, OOCL, CSCL, MSC, etc. and train shipping is also available. 
The perfect shipping way and best service with lowest price are always provided for customers.

Application:

1.It is the key machine in the process of the heating, annealing, quenching, drying, firing for the rolling reheating furnace and industry boiler in the metallurgy industry, building material industry, mining industry, chemical industry, etc.

2.It is also used for the powder manufacturing of coke powder, coal gangue, phosphate fertilizer, slag, limestone and plaster.

Production Process

High Efficiency Pulverizer Mill with Energy Saving

Our Project
High Efficiency Pulverizer Mill with Energy Saving

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours